Interstate 84 in Connecticut
Route information | ||||
---|---|---|---|---|
Maintained by CTDOT | ||||
Length | 97.90 mi[1] (157.55 km) | |||
Existed | 1969–present | |||
NHS | Entire route | |||
Major junctions | ||||
West end | I-84 at the New York state line in Danbury | |||
| ||||
East end | I-84 at the Massachusetts state line in Union | |||
Location | ||||
Country | United States | |||
State | Connecticut | |||
Counties | Fairfield, New Haven, Hartford, Tolland, Windham | |||
Highway system | ||||
| ||||
|
Interstate 84 (I-84) is an east–west Interstate Highway across the state of Connecticut through Danbury, Waterbury, Hartford, and Union.
Route description
[edit]I-84 enters Danbury from the town of Southeast, New York, and is designated the Yankee Expressway for the next 62 miles (100 km). About 3.5 miles (5.6 km) to the east, US Route 7 (US 7) joins from the south at exit 3 near Danbury Fair as I-84 turns north. At the next exit, US 6 and US 202 join to form a four-way concurrency for the next three miles (4.8 km) to exit 7, when US 7 and US 202 split off north toward New Milford. US 6 leaves the Interstate at the following exit, as I-84 climbs away from Danbury into the more rural towns of Bethel and Brookfield.
US 6 rejoins I-84 at exit 10, and, at exit 11, it turns to the northeast and descends to cross the Housatonic River on the Rochambeau Bridge, into New Haven County. After US 6 leaves once again at exit 15 in Southbury, I-84 proceeds through hilly terrain into Middlebury, becoming more of an urban freeway as it enters the city of Waterbury, where it intersects the Route 8 expressway and crosses the Naugatuck River on an elevated dual-decked viaduct known locally as the Mixmaster. After passing through Cheshire, I-84 intersects the western end of I-691 at the Cheshire–Southington town line, which is also the New Haven–Hartford county line.
I-84 turns more northerly for a stretch to exit 31 (Route 229), which provides access to Lake Compounce and ESPN World Headquarters. The freeway heads more northeasterly to Plainville, where it has a brief 0.5-mile (0.80 km) concurrency with Route 72 to the New Britain city line. From the Route 72 junction through Farmington, West Hartford, and into Hartford, I-84 has many left-hand exits and entrances and sharp curves, which were built for a planned network of freeways. In Farmington, US6 joins I-84 once again at exit 38 and both meet the northern end of the Route 9 expressway at a half-used multilevel stack interchange that was originally planned to be part of the mostly-canceled I-291 Hartford Beltway. I-84 and US 6 pass through West Hartford into Hartford (the largest city along the length of the eastern I-84) where they intersect I-91, just before US 44 briefly joins to cross the Connecticut River into East Hartford on the Bulkeley Bridge, which is the oldest bridge on the Interstate System.
After the bridge, US 44 leaves, the name of the highway changes to the Lieutenant Brian L. Aselton Memorial Highway, and I-84 meets the Route 2 expressway, which provides access to the southeastern suburbs of Hartford. As I-84 passes the northern end of the Route 15 expressway, it inherits the Wilbur Cross Highway name for the rest of its length. From 1968 until 1984, the I-84 designation ended here, and the highway became I-86 for the rest of its length, as I-84 was once planned to be built east toward Providence, Rhode Island. I-84 intersects one of the remnants of the abandoned project, I-384, as part of a three-mile (4.8 km) series of complex interchanges in Manchester including the end of the US 6 concurrency at exit 60, and a connection to the only built as originally planned portion of I-291 at exit 61.
Beyond Manchester, I-84 climbs steadily from the Connecticut River Valley and passes through the Tolland County towns of Vernon, Tolland, and Willington. Junctions in Tolland and Willington connect to Connecticut Route 195 and Connecticut Route 32, respectively, both providing access to the main campus of the University of Connecticut in Storrs, Connecticut, south toward Windham.
North of Willington, I-84 briefly enters the Windham County town of Ashford and reenters Tolland County in the town of Union. After exit 74 (Route 171), I-84 crosses the Massachusetts state line.
History
[edit]New York to Hartford to Massachusetts (1961-1968)
[edit]I-84 opened in stages from the New York State Line in Danbury starting in 1961, finally connecting to Hartford in 1969. In Hartford, I-84 crossed the Bulkeley Bridge and continued towards Sturbridge, MA, along the existing Wilbur Cross Highway, matching I-84's present alignment.
Between 1968, and 1984 however, I-84 was reassigned to a proposed freeway to connect Hartford to Providence, RI. The segment northeast of Hartford was redesignated as I-86. In 1984, the freeway to Providence was cancelled, and I-84 reverted to its current ailignment. Some isolated stretches of freeway built towards Providence were reassigned to other route numbers.[2]
Proposed 1970s route east of Hartford
[edit]
Location | East Hartford–Providence |
---|---|
Existed | 1956–1968 |
History | Redesignated as I-84 in 1968 |
Location | East Hartford–Providence |
---|---|
Existed | 1968–1984 |
History | Canceled; completed sections redesignated as I-384 and US 6 in 1984 |
A highway connecting Hartford and Providence was first brought up in 1944 as an upgrade to US 6 from Manchester to the Rhode Island state line.[3][4] The plan eventually adapted to a submission to the 1956 Interstate Highway Plan but was declined. It was resubmitted in the 1968 plan and was granted along with 1,500 other miles (2,400 km) of Interstate.[5]
The highway was firstly designated as Interstate 82 (I-82) but was changed shortly after to its well-known designation, Interstate 84 (I-84).[5] In 1970 through 1973, the first segments of the highway started construction, the segment now designated as I-384, and the Willimantic Bypass.[3] When these isolated segments were completed, they were designated for the future Interstate, starkly different from today's signs. The signs remained on the Willimantic Bypass up to a decade after the cancellation of the project.[6]
The planned I-84 was going to also incorporate a cloverleaf intersection with I-295 in Johnston, Rhode Island, and use the under-construction Dennis J. Roberts Expressway and built Huntington Expressway to Providence before the project was shelved.[7] Briefly, there was an idea to use the southern/unused portion of the highway for Interstate 184 (I-184) but was disapproved by the FHA.[8]
An environmental study by the Rhode Island Department of Transportation (RIDOT) was done in 1972; it was found the highway would cause heavy impact to Scituate Reservoir, the main drinking supply for Providence.[9][10] After conducting multiple other studies, including briefly considering an alternate southern alignment that would bypass the Scituate Reservoir to the south and connected I-84 to the Route 37 Expressway, Rhode Island ended up canceling their segment of the highway in 1982, which ended up causing Connecticut to cut the segment to I-395 in Plainfield.[11] Without Rhode Island, the highway was fully canceled in 1983, and the mileage was returned for other projects.[12][13]
After the highway was canceled, the only inland route to Providence from Hartford was either US 44 or US 6. Many projects have since happened to improve the roads, mainly in Connecticut.[14][15] One major one was improving the "Suicide 6" area of US 6 between Bolton and Columbia.[16][17] Since the cancelation, other plans to have a freeway link between the two built segments have been proposed, including one in 2001, but was short lived, only lasting to 2003 before becoming dormant.[3][18]
In the 1992 long-range transportation plan released by RIDOT, a freeway has been added along the original route of I-84 that will connect to the Route 695 freeway on the Rhode Island–Connecticut border.[19]
I-86 relation
[edit]Location | East Hartford–Union (Massachusetts state line) |
---|---|
Length | 31.27 mi (50.32 km) |
Existed | 1968–1984 |
History | Redesignated as I-84 in August 1984[20] |
The section of I-84 between East Hartford, Connecticut, (at the present-day junction with I-384) and Sturbridge, Massachusetts, (I-90) was for a time signed as I-86 (unrelated to present-day I-86 in New York and Pennsylvania). Signs stating "I-84 Ends, I-86 to Boston" (eastbound) and "I-86 Ends, I-84 to Hartford" (westbound) were posted where the change took place; later, when I-84 was restored to its original routing, new signs went up that read "I-86 is now I-84". Exit numbering on I-86 was that of the road's predecessor, Route 15, in a sequence beginning on New York's Hutchinson River Parkway. Exits were renumbered to correspond with the rest of I-84 in Connecticut when the road was redesignated in 1984. The present I-384 as well as the present US 6 bypass near Willimantic, both of which were a part of what was then I-84's planned easterly continuation, were also numbered I-84 prior to 1984 even though they lacked any direct connection to the rest of I-84 at that time. (One had to use Silver Lane in East Hartford to travel between the two stretches of the highway.) These two sections were renumbered. The western segment became I-384, and the eastern one became part of US 6 when what was then I-86 was renumbered I-84.[citation needed]
The present 4-way interchange between I-84, I-384, and I-291 in Manchester reflects the planned extension of I-84 towards Providence; the I-84 through lanes coming west from Hartford align with the present-day lanes heading east on I-384. Similarly, the Wilbur Cross Highway (CT Route 15) merges with I-84 on the left side in East Hartford, and aligns with the lanes of I-84 heading northeast towards Sturbridge. As designed, this would have allowed I-84 to continue east towards Rhode Island, and the Wilbur Cross Highway to follow I-86 to Massachusetts.[21]
Upgrades
[edit]Sections of I-84 in Connecticut were reconstructed and widened from the mid-1970s into the mid-1980s. Another section through Danbury was widened from four lanes to six lanes in 1985 and 1986. Widening of the highway through Danbury was funded by Union Carbide as part of building its world headquarters in Danbury.[22] From roughly 1976 to 1988 the former I-86 portion from East Hartford to the Massachusetts state line was completely rebuilt from a narrow four-lane parkway to a much wider profile ranging from six lanes at the Massachusetts state line, expanding to eight lanes in Vernon, to 12 lanes with high-occupancy vehicle lanes (HOV lanes) in East Hartford. The original route, then known as Route 15, featured pit latrines at its pull-offs or rest areas. As of 2014, planning is underway for the I-84 Hartford Project to replace and possibly redesign a two-mile (3.2 km) stretch of mostly elevated highway in Hartford. On April 22, 2015, construction began on widening the highway from exit 23 to exit 25A in Waterbury from four lanes to six lanes.
A widening project along the congested stretch of I-84 through Waterbury and Cheshire has been beset by cost overruns, delays, and construction defects involving storm drains,[23] as state and federal officials have launched criminal investigations stemming from this project. This episode has waned local enthusiasm for a proposed $2-billion reconstruction of the Mixmaster interchange in downtown Waterbury.[24] Cost estimates for the Mixmaster replacement have increased to $3 billion.[25] Connecticut Attorney-General Richard Blumenthal has begun a lawsuit against the contractor and an engineering firm in response to threats from the US Department of Transportation (USDOT) to withhold funds from the project.[26] On May 18, 2007, the Republican-American reported this area had defective light poles,[27] while Governor Jodi Rell released an audit report of the construction disaster.[28]
Future
[edit]The I-84 Hartford Project[29] is a Connecticut Department of Transportation (CTDOT) project to address structural deficiencies within the I-84 corridor approximately between Flatbush Avenue (exit 45) and the I-91 interchange in Hartford, including a 3,200-foot (980 m) elevated section known as the Aetna Viaduct. Since it became apparent in the 1980s that this section of I-84 in Hartford was deteriorating, CTDOT has considered how best to repair or reconstruct the corridor. Since that time, many inspections have been carried out and frequent repairs made to keep the highway safe and functioning.[30]
In 2010, the Capitol Region Council of Governments (CRCOG), the City of Hartford, and CTDOT collaborated on a study of the corridor to begin the process of exploring reconstruction options. That study looked at several concepts, including the rebuilding of the viaduct "in-kind", as well as several reconstruction alternatives that would alter the configuration of the highway. The alternatives developed for that study were conceptual in nature—they did not look in depth at traffic, engineering feasibility, or environmental impact. However, the strong stakeholder input as part of that effort was helpful in leading to CTDOT's decision to initiate the I-84 Hartford Project, to build on the good work of that earlier study. The I-84 Hartford Project will be a full and comprehensive evaluation leading to a workable solution. The I-84 Hartford Project will examine the feasibility and assess the impact of a range of concepts. Following full examination of the impacts and benefits of feasible alternatives, and, in collaboration with stakeholders and the public, CTDOT will make a final decision on how to reconstruct this section of the I-84 corridor.[31][32]
Exit list
[edit]County | Location | mi[33] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
Fairfield | Danbury | 0.00 | 0.00 | – | I-84 west – Newburgh | Continuation into New York; to I-684 |
0.04– 0.44 | 0.064– 0.71 | 1 | US 6 / US 202 / Saw Mill Road | Eastbound exit and westbound entrance extend into New York; US 6 / US 202 not signed | ||
0.78– 1.36 | 1.26– 2.19 | 2 | US 6 / US 202 (Mill Plain Road) / Old Ridgebury Road – Rest Area / Welcome Center | Signed as exits 2B (US 6) and 2A (Old Ridgebury) westbound; no westbound access to Rest Area/Welcome Center | ||
3.24– 3.70 | 5.21– 5.95 | 3 | US 7 south – Norwalk | Western terminus of US 7 concurrency; exit 9 on US 7; also serves Danbury Airport | ||
3.76 | 6.05 | 4 | US 6 west / US 202 west (Lake Avenue) | Western terminus of US 6 / US 202 concurrency | ||
5.27 | 8.48 | 5 | Route 37 north / Route 39 north / Route 53 south – Downtown Danbury, Bethel | Route 37 not signed westbound | ||
5.84 | 9.40 | 6 | Route 37 – New Fairfield | Westbound exit and eastbound entrance | ||
7.34– 7.77 | 11.81– 12.50 | 7 | US 7 north / US 202 east – Brookfield, New Milford | Eastern terminus of US 7 / US 202 concurrency; exit 10 on US 7 | ||
Danbury–Bethel line | 8.17– 8.79 | 13.15– 14.15 | 8 | US 6 east / Newtown Road (SR 806 west) – Bethel | Eastern terminus of US 6 concurrency; US 6 not signed westbound | |
Brookfield–Newtown line | 11.44 | 18.41 | 9 | Route 25 – Brookfield | ||
Newtown | 15.12 | 24.33 | 10 | US 6 west – Newtown, Sandy Hook | Western terminus of US 6 concurrency | |
16.14– 16.64 | 25.97– 26.78 | 11 | Route 34 to Route 25 – Derby, New Haven, Bridgeport | Access via SSR 490 | ||
18 | 29 | 12 | Underhill Road, Lake Drive | Removed in the 1970s; right-in/right-out interchange; connected to Underhill Road eastbound; Lake Drive westbound[34] | ||
Housatonic River | 18.48 | 29.74 | Rochambeau Bridge | |||
New Haven | Southbury | 18.74 | 30.16 | 13 | River Road | Eastbound exit and westbound entrance |
20.21 | 32.52 | 14 | Route 172 north – South Britain | |||
22.00 | 35.41 | 15 | US 6 east / Route 67 – Southbury | Eastern terminus of US 6 concurrency | ||
24.80 | 39.91 | 16 | Route 188 – Southford, Middlebury | Signed for Southford westbound, Middlebury eastbound | ||
Middlebury–Waterbury line | 29.81 | 47.97 | 17 | Route 63 – Watertown, Naugatuck | Eastbound exit and westbound entrance | |
30.48 | 49.05 | Route 64 west to Route 63 – Middlebury, Watertown | Westbound exit and eastbound entrance | |||
Waterbury | 31.35– 31.65 | 50.45– 50.94 | 18 | Chase Parkway (SSR 845) | No westbound exit | |
West Main Street / Highland Avenue | Westbound exit and eastbound entrance | |||||
32.02 | 51.53 | 19-20 | Route 8 – Bridgeport, Torrington | Mixmaster Interchange; signed as exits 19 (south) and 20 (north); exits 30A-C on Route 8 | ||
32.45– 32.76 | 52.22– 52.72 | 21 | Meadow Street / Bank Street | |||
32.60– 33.56 | 52.46– 54.01 | 22 | Baldwin Street / Union Street – Downtown Waterbury | Signed for Baldwin Street eastbound, Union Street westbound | ||
33.02– 34.21 | 53.14– 55.06 | 23 | Route 69 (Hamilton Avenue) – Wolcott, Prospect | Wolcott/Prospect not signed westbound | ||
34.36 | 55.30 | 25 | Harpers Ferry Road / Reidville Drive | Eastbound exit and westbound entrance | ||
35.62 | 57.32 | East Main Street / Scott Road | Westbound exit and eastbound entrance | |||
36.73 | 59.11 | 25A | Austin Road | Serves University of Bridgeport | ||
Cheshire | 38.12 | 61.35 | 26 | Route 70 – Cheshire, Prospect | Prospect not signed eastbound | |
40.04– 41.04 | 64.44– 66.05 | 27 | I-691 east – Meriden | Western terminus and exits 8B-A on I-691 | ||
Hartford | Southington | 28 | Route 322 – Marion, Milldale, Wolcott | |||
41.89 | 67.42 | 29 | Route 10 – Milldale | Westbound left exit and eastbound entrance; access via SR 597 | ||
42.52 | 68.43 | 30 | West Main Street / Marion Avenue | |||
44.34 | 71.36 | 31 | Route 229 (West Street) – Bristol | Lake Compounce Amusement Park and ESPN World Headquarters | ||
46.23 | 74.40 | 32 | Route 10 (Queen Street) | |||
Plainville | 48.98– 49.48 | 78.83– 79.63 | 33 | Route 72 west to Route 372 (New Britain Avenue) – Bristol | Western terminus of Route 72 concurrency; no eastbound access to Route 372 | |
34 | Crooked Street (SR 536 north) to Route 372 – Plainville | No westbound exit | ||||
New Britain | 50.00– 50.61 | 80.47– 81.45 | 35 | Route 72 east to Route 9 – New Britain, Middletown | Eastern terminus of Route 72 concurrency | |
50.65– 51.19 | 81.51– 82.38 | 36 | Slater Road | Left exit eastbound | ||
Farmington | 53.24 | 85.68 | 37 | Fienemann Road to US 6 west | US 6 not signed westbound | |
54.04– 54.35 | 86.97– 87.47 | 38 | US 6 west – Bristol | Western terminus of US 6 concurrency; westbound exit and eastbound entrance | ||
39 | To Route 4 – Farmington | Access via SR 508 | ||||
54.99– 56.00 | 88.50– 90.12 | 39A | Route 9 south – Newington | Northern terminus and exits 40A-B on Route 9 | ||
West Hartford | 56.27 | 90.56 | 40 | Route 71 (New Britain Avenue) – Corbins Corner | ||
57.23 | 92.10 | 41 | South Main Street (Route 173 south) – Elmwood | |||
58.05 | 93.42 | 42 | Trout Brook Drive - Elmwood | Westbound exit and eastbound entrance | ||
57.95– 58.40 | 93.26– 93.99 | 43 | Park Road – West Hartford Center | Access via SR 501 | ||
59.17 | 95.22 | 44 | Prospect Avenue / Oakwood Avenue | Access via Caya Avenue/Kane Street | ||
Hartford | 59.93 | 96.45 | 45 | To Flatbush Avenue | Westbound exit and eastbound entrance; access via SR 504 | |
60.45– 60.79 | 97.28– 97.83 | 46 | Sisson Avenue / West Boulevard | Access via SR 503 | ||
61.04 | 98.23 | 47 | Sigourney Street | Westbound exit and eastbound entrance | ||
61.38– 61.77 | 98.78– 99.41 | 48A | Asylum Street | Signed as exit 48 westbound | ||
48B | Capitol Avenue | Eastbound exit and westbound entrance | ||||
61.99 | 99.76 | 49 | Chapel Street / High Street / Ann Uccello Street | Eastbound exit and westbound entrance | ||
62.04– 62.63 | 99.84– 100.79 | 50 | I-91 south / US 44 west (Main Street) – Downtown Hartford, New Haven | Western terminus of US 44 concurrency; I-91 / US 44 not signed eastbound | ||
51-52 | I-91 – New Haven, Springfield, Bradley International Airport | Signed as exits 51 (north) and 52 (south); no westbound access to I-91 south; exits 38A-C on I-91 | ||||
Connecticut River | 62.58– 62.82 | 100.71– 101.10 | Bulkeley Bridge | |||
East Hartford | 62.95 | 101.31 | 53 | US 44 east (Connecticut Boulevard) / East River Drive – East Hartford | Eastern terminus of US 44 concurrency; no westbound exit | |
63.18– 63.49 | 101.68– 102.18 | 54-55 | Route 2 – Norwich, New London, Downtown Hartford | Signed as exits 54 (west) and 55 (east); no eastbound access to Route 2 west; Route 2 west not signed | ||
63.37– 63.63 | 101.98– 102.40 | 56 | Governor Street – Downtown East Hartford | Access via SR 500; exit was originally intended for the never-built I-284 | ||
♦ | Restricted Lanes – Buses and 2 person car pools | Western terminus of HOV lanes | ||||
64.84 | 104.35 | Transition between Yankee Expressway and Wilbur Cross Highway | ||||
57 | Route 15 south (Wilbur Cross Highway) to I-91 south – Charter Oak Bridge, New York City | Westbound exit and eastbound entrance | ||||
64.64– 65.21 | 104.03– 104.95 | ♦ | Silver Lane (SR 502) | HOV access only; westbound exit and eastbound entrance | ||
58 | Roberts Street (SR 518) / Silver Lane (SR 502) / Burnside Avenue | |||||
66.43– 68.61 | 106.91– 110.42 | 59 | I-384 east – Providence | Western terminus and exit 1A on I-384 | ||
♦ | I-384 east – Providence | HOV access only; eastbound exit and westbound entrance; western terminus of I-384 | ||||
Manchester | 68.05 | 109.52 | 60 | US 6 east / US 44 (Middle Turnpike West / Burnside Avenue) – Manchester, East Hartford | Eastern terminus of US 6 concurrency; signed for US 6 eastbound, Burnside westbound | |
68.17– 69.03 | 109.71– 111.09 | 61 | I-291 west to I-91 – Windsor | Eastern terminus and exits 6B-C on I-291 | ||
69.84 | 112.40 | 62 | Buckland Street | |||
♦ | Buckland Street | HOV access only; eastbound exit and westbound entrance | ||||
71.60 | 115.23 | 63 | Route 30 / Route 83 – South Windsor, Manchester | |||
Tolland | Vernon | 73.00 | 117.48 | 64 | Route 30 / Route 83 south – Vernon Business District, Rockville, Talcottville | Eastbound exit shares a ramp with exit 65 |
♦ | Route 30 / Route 83 – Vernon Center, Rockville | HOV access only; eastbound exit and westbound entrance | ||||
73.27 | 117.92 | Eastern terminus of HOV lanes | ||||
73.00– 73.93 | 117.48– 118.98 | 65 | Route 30 north – Vernon Center | |||
74.80 | 120.38 | 66 | Tunnel Road – Vernon, Bolton | |||
77.28 | 124.37 | 67 | Route 31 – Rockville, Coventry | |||
Tolland | 81.06 | 130.45 | 68 | Route 195 – Tolland, Storrs | Serves University of Connecticut | |
83.99 | 135.17 | 69 | Route 74 to US 44 – Willington, Putnam | Signed for Willington eastbound, Putnam westbound | ||
Willington | 85.58 | 137.73 | 70 | Route 32 – Stafford Springs, Willington, Mansfield, Willimantic | ||
87.79 | 141.28 | 71 | Route 320 south (Ruby Road) | |||
Windham–Tolland county line | Ashford–Union line | 92.05 | 148.14 | 72 | Route 89 – Westford, Ashford | |
Tolland | Union | 93.41 | 150.33 | 73 | Route 190 – Union, Stafford Springs | |
97.38 | 156.72 | 74 | Route 171 east / Holland Road – Union, Holland, Mass | |||
97.90 | 157.55 | – | I-84 east (Wilbur Cross Highway) – Boston | Continuation into Massachusetts; to Mass Pike | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Auxiliary routes
[edit]Interstate | City | Notes | |
---|---|---|---|
Interstate 284 | East Hartford | Unfinished and decommissioned. Partially exists as a freeway stub from I-84 to Governor Street. I-284 was originally planned to continue northward along the east bank of the Connecticut River to I-291. | |
Interstate 384 | Manchester | ||
Interstate 484 | Hartford | Unfinished and decommissioned. Partially exists as the Conland–Whitehead Highway | |
Interstate 684 | Greenwich | This route extends for 1.4 miles (2.3 km) in Connecticut, with all interchanges in New York; originally designated as I-87 |
References
[edit]- ^ Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Retrieved August 10, 2022.
- ^ "Connecticut I-84". www.kurumi.com.
- ^ a b c Oglesby, Scott. "From Hartford to Providence". www.kurumi.com. Retrieved November 15, 2016.[self-published source]
- ^ "Road Plan Urged for Connecticut; Highway Department Favors $400,000,000 Long-Range System of Expressways". The New York Times. March 31, 1953. ISSN 0362-4331. Retrieved November 16, 2016.
- ^ a b "Dennis J Roberts Expressway (US 6)". www.bostonroads.com. Retrieved November 15, 2016.[self-published source]
- ^ Oglesby, Scott. "Connecticut I-384". www.kurumi.com. Retrieved November 15, 2016.[self-published source]
- ^ I-84 Extension from I-295 to the Connecticut State Line: Environmental Impact Statement. 1972.
- ^ "Huntington Expressway (RI 10 and US 6)". www.bostonroads.com. Retrieved November 16, 2016.[self-published source]
- ^ "677 F.2d 259". law.resource.org. Retrieved November 16, 2016.
- ^ I-84 Extension from I-295 to the Connecticut State Line: Environmental Impact Statement. 1972.
- ^ Wald, Matthew L. (October 16, 1979). "Goldschmidt Says I‐84 to Proceed In Connecticut, but He Is Doubted". The New York Times. ISSN 0362-4331. Retrieved November 16, 2016.
- ^ I-84, Section 2 Corridor Location Between Windham and Rhode Island State Line: Environmental Impact Statement. 1976.
- ^ I-84, Section 1, Corridor Location Between Manchester and Columbia: Environmental Impact Statement. 1976.
- ^ US-6 Improvements, Killingly, CT to Johnston, RI: Environmental Impact Statement. 1985.
- ^ "Army Corps Considers Route 6". Hartford Courant. Retrieved November 16, 2016.
- ^ "Report: Connecticut Has Nation's Deadliest Rural Roads". Hartford Courant. Retrieved November 15, 2016.
- ^ "Getting Ready To Start Route 6 Project". Hartford Courant. Retrieved November 16, 2016.
- ^ "MTR 258, Third Time as Farce: ConnDOT Tries Again for Twice-rejected Road -". www.tstc.org. Archived from the original on May 12, 2016. Retrieved November 16, 2016.
- ^ Anderson, Steve. "Dennis J Robers Expressway (US 6)". BostonRoads.com.[self-published source]
- ^ "State Changes Route Designation". The North Adams Transcript. North Adams, Massachusetts. August 15, 1984. p. 3. Retrieved September 14, 2019 – via Newspapers.com.
- ^ Interchange of I-86 and I-84, East Hartford and Manchester, Connecticut Department of Transportation, 1982
- ^ "Do You Remember?". Danbury News-Times. September 4, 2005.
- ^ "Storm Drains". News Times. April 24, 2007. Retrieved December 30, 2017.
- ^ "Interchange Construction Planned: For 2021". Hartford, CT: WFSB-TV. September 25, 2006. Archived from the original on September 27, 2007. Retrieved April 16, 2011.
- ^ [1][dead link]
- ^ "Topic Galleries". Hartford Courant. Archived from the original on January 21, 2013. Retrieved April 16, 2011.
- ^ "Light poles". News Times. May 19, 2007. Retrieved December 30, 2017.
- ^ Cooper, Chris (May 28, 2007). "Governor Rell: I-84 Consultant Releases Final Audit Report" (Press release). Office of the Governor. Retrieved April 16, 2011.
- ^ "I-84 Hartford Project". i84hartford.com. Retrieved August 11, 2022.
- ^ "Aetna Viaduct". Courant.com. Retrieved December 30, 2017.
- ^ Hyman, Dylan (September 8, 2016). "I-84 Hartford viaduct project moving forward". New Haven, CT: WTNH-TV. Retrieved September 11, 2016.
- ^ "DOT: No Tunnel For New I-84 In Hartford". Hartford Courant. Retrieved September 11, 2016.
- ^ Roadway Inventory Section (December 31, 2014). Highway Log: Connecticut State Numbered Routes and Roads (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on September 5, 2015. Retrieved August 21, 2016.
- ^ Carey, Ethan (March 18, 2022). "What's Up with New Exit Numbers on Connecticut's Highways?". i95 Rock. Brookfield, Connecticut: WRKI-FM. Retrieved August 1, 2024.
External links
[edit]
- Interstate Highways in Connecticut
- Interstate 84 (Pennsylvania–Massachusetts)
- Transportation in Fairfield County, Connecticut
- Transportation in New Haven County, Connecticut
- Transportation in Hartford County, Connecticut
- Transportation in Tolland County, Connecticut
- Transportation in Windham County, Connecticut